Commercial service agreements24/7 leak response

SVC-08

New construction roofing

Roofing packages for general contractors on tilt-wall, steel and mixed-use buildings.

Service
SVC-08
Dispatch
24/7
Area
Greater Houston
Survey
Free
Workers on a multi-storey building site using tools amidst a cloudy backdrop.

Overview

General contractors hire us because we show up when the deck is ready, submit clean paperwork and keep our crews tied off. We bid from drawings and specs, flag conflicts at RFI stage and carry roofing, sheet metal and roof accessories in one package.

Our preconstruction team reviews insulation R-values against energy code, wind uplift against the structural drawings and drain sizing against the plumbing plan so problems get solved on paper.

What's included

  • Plan and spec takeoff with RFIs
  • Submittals and manufacturer approvals
  • Roofing, sheet metal and accessories package
  • Temporary roof for early dry-in
  • Coordination with MEP rooftop work
  • Closeout documents and warranties
Two construction workers in safety gear collaborate on scaffolding at a building site.

Why owners choose us for this work

Schedule reliability

Crews sized to the GC's look-ahead schedule.

Clean paperwork

Submittals, certified payroll and closeout on time.

Safety culture

Sample EMR of 0.72 and weekly toolbox talks.

The process

  1. Bid

    Takeoff, clarifications and alternates on bid day.

  2. Submit

    Product data, shop drawings and uplift calculations.

  3. Mobilize

    Site-specific safety plan and hoisting schedule.

  4. Build

    Temporary roof, insulation, membrane and metal.

  5. Close out

    Punch list, manufacturer inspection and warranty.

What drives the price

Priced from plans and specs; send drawings for a bid-day number. Every proposal lists inclusions and exclusions line by line so bids compare fairly.

Build a sample budget
Specification and system
Membrane, insulation and warranty length
Building height and hoisting
Crane or material hoist time
Schedule
Temporary roofs and phased mobilizations
Bonding and prevailing wage
Public work requirements

New construction roofing FAQ

Straight answers on bids, schedules, leaks and warranties. Still stuck? Our estimating desk answers the phone.

Estimating desk

(713) 555-0234All FAQs

Yes. We carry bonding capacity for school district and municipal work (sample capacity figures available on request).

Yes. A temporary vapor retarder or base ply lets interior trades start before the permanent roof is complete.

From 20,000 sq ft retail pads to 600,000 sq ft distribution centers.

Put this on the schedule

Free roof survey, a written scope and a start date your operations team can plan around.

Free roof survey · Written proposal in 5 to 7 business days (sample)

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.