Project case studies
Square footage, schedules and the constraints we worked around. Clients are anonymized samples for this demo.

- 1,026KSquare feet across featured projects
- 0Unplanned shutdowns on featured projects
- 9 daysAhead of schedule on the Katy summer reroof
- 20 hrsFrom storm call to full dry-in in Baytown
Figures shown are sample project data.
Featured case studies
Each case study includes before and after photos, the scope, the schedule and the result.
- PRJ-2511

Clinton Drive distribution center reroof
412,000 sq ft · TPO · 9 weeks · Houston, TX 77029
Read case study - PRJ-2508

Westheimer retail center restoration
96,500 sq ft · Coatings · 4 weeks · Houston, TX 77057
Read case study - PRJ-2504

Medical office campus PVC replacement
138,000 sq ft · PVC · 8 weeks · Sugar Land, TX 77479
Read case study - PRJ-2419

Pasadena plant metal retrofit
184,000 sq ft · Metal · 14 weeks · Pasadena, TX 77506
Read case study - PRJ-2412

Katy middle school summer reroof
121,000 sq ft · Mod bit · 10 weeks · Katy, TX 77494
Read case study - PRJ-2407

Baytown flex warehouse storm recovery
74,800 sq ft · TPO · 6 weeks · Baytown, TX 77521
Read case study
Field photos
Crews, details and rooftops from recent work.
Clean perimeter with ES-1 edge metal
Tie-off at every open edge
Aerial roof plan before tear-off
Curbs raised to manufacturer height
Service tech on a flex building roof
Rust and fastener leaks before retrofit
Your building could be next
Share the roof size and timeline. We will bring a phased plan to the survey.
Free roof survey · Written proposal in 5 to 7 business days (sample)