Commercial service agreements24/7 leak response

PRJ-2419 · 2024

Pasadena plant metal retrofit

Standing seam retrofit over a leaking R-panel roof with production running underneath.

Area
184,000 sq ft
Duration
14 weeks
System
Metal
Location
Pasadena

Before and after

Pasadena plant metal retrofit before work
Pasadena plant metal retrofit after completion

Drag the handle to compare. Photos are representative samples.

The challenge

Thousands of failed fasteners and a production line that could not stop for more than one planned weekend.

Our approach

  • Engineer-reviewed zee framing over existing purlins
  • Old roof left in place as debris barrier
  • New insulation added in the retrofit cavity
  • Exhaust stacks re-flashed with PVC-coated metal
0unplanned production stops
R-19added insulation
35 yrweathertight warranty (sample)

Our line never stopped. That was the only metric my plant manager cared about.

Hector VillanuevaMaintenance director, sample client
0unplanned production stops

More case studies

Other recent work across Greater Houston.

Start a project like this

We have installed metal retrofit on buildings like yours. Let us survey the roof.

Free roof survey · Written proposal in 5 to 7 business days (sample)

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.