PRJ-2419 · 2024
Pasadena plant metal retrofit
Standing seam retrofit over a leaking R-panel roof with production running underneath.
- Area
- 184,000 sq ft
- Duration
- 14 weeks
- System
- Metal
- Location
- Pasadena
Before and after


Drag the handle to compare. Photos are representative samples.
The challenge
Thousands of failed fasteners and a production line that could not stop for more than one planned weekend.
Our approach
- Engineer-reviewed zee framing over existing purlins
- Old roof left in place as debris barrier
- New insulation added in the retrofit cavity
- Exhaust stacks re-flashed with PVC-coated metal
0unplanned production stops
R-19added insulation
35 yrweathertight warranty (sample)
Our line never stopped. That was the only metric my plant manager cared about.
0unplanned production stops
More case studies
Other recent work across Greater Houston.
Start a project like this
We have installed metal retrofit on buildings like yours. Let us survey the roof.
Free roof survey · Written proposal in 5 to 7 business days (sample)