PRJ-2407 · 2024
Baytown flex warehouse storm recovery
Emergency dry-in after hurricane winds peeled the perimeter, then a full TPO replacement.
- Area
- 74,800 sq ft
- Duration
- 6 weeks
- System
- TPO
- Location
- Baytown
Before and after


Drag the handle to compare. Photos are representative samples.
The challenge
Wind uplift removed 9,000 sq ft of membrane and exposed tenant inventory overnight.
Our approach
- Dry-in completed within 20 hours of the first call
- Drone mapping and core samples for the claim file
- Met adjuster on site with the damage report
- New ES-1 edge metal with enhanced corner fastening
20 hrsto full dry-in
74.8Ksq ft replaced
FM 1-120uplift rating
They were on the roof before the rain stopped and had the report ready for our adjuster by Monday.
20 hrsto full dry-in
More case studies
Other recent work across Greater Houston.
Start a project like this
We have installed tpo membrane on buildings like yours. Let us survey the roof.
Free roof survey · Written proposal in 5 to 7 business days (sample)




