Commercial service agreements24/7 leak response

SVC-05

Preventive roof maintenance

Scheduled service visits that clear drains, reseal details and keep warranties valid.

Service
SVC-05
Dispatch
24/7
Area
Greater Houston
Survey
Free
Silhouette of construction workers on a building site with one pointing towards the distance.

Overview

Most commercial roof failures start small: a clogged drain that ponds, a loose counterflashing, a pitch pan that dried out. Preventive maintenance catches them while they are a line item rather than a claim.

Each visit follows a 42-point checklist, clears debris, reseals minor openings under a pre-approved repair limit and updates the roof history in your portal. See full tiers on our maintenance plans page.

What's included

  • Spring and fall visits with 42-point checklist
  • Drain, scupper and gutter clearing
  • Minor sealant and flashing repairs
  • Post-storm walk after named storms
  • Photo report and updated roof plan
  • Warranty maintenance documentation
Exterior view of industrial air conditioning units mounted on a warehouse wall under clear blue sky.

Why owners choose us for this work

Fewer emergency calls

Agreement roofs log far fewer leak tickets (sample data).

Warranty protection

Documented maintenance manufacturers ask for.

Priority response

Agreement customers go first after storms.

The process

  1. Baseline

    First visit builds the roof plan and condition grade.

  2. Schedule

    Visits locked to spring and fall before storm season.

  3. Service

    Checklist, clearing and minor repairs on the spot.

  4. Report

    Photo report and priorities uploaded to the portal.

  5. Plan

    Annual budget review with your facility team.

What drives the price

Sample plans start around $0.06 per sq ft per year for a two-visit program. Every proposal lists inclusions and exclusions line by line so bids compare fairly.

Build a sample budget
Roof area
Visits are priced by square footage bands
Rooftop equipment density
More curbs and units mean more details to service
Visit frequency
Two, three or four visits per year
Repair allowance
Pre-approved dollar limit per visit

Preventive roof maintenance FAQ

Straight answers on bids, schedules, leaks and warranties. Still stuck? Our estimating desk answers the phone.

Estimating desk

(713) 555-0234All FAQs

Yes. New roofs still collect debris and get damaged by HVAC trades. Maintenance also documents compliance with warranty terms.

A dollar amount, for example $750 per visit, that lets technicians fix small problems immediately without a separate purchase order.

Yes. Portfolio agreements let you add sites at the same rate card.

Put this on the schedule

Free roof survey, a written scope and a start date your operations team can plan around.

Free roof survey · Written proposal in 5 to 7 business days (sample)

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.