Clinton Drive distribution center reroof

Tear-off of a leaking BUR roof and new 60 mil TPO with tapered insulation over a 24-hour cross-dock.

Area
412,000 sq ft
Duration
9 weeks
System
TPO
Location
Houston

Before and after

Clinton Drive distribution center reroof before work
Clinton Drive distribution center reroof after completion

Drag the handle to compare. Photos are representative samples.

The challenge

The building ran three shifts with 118 dock doors, and 40 percent of the old roof insulation was wet.

Our approach

  • Infrared survey mapped 164,000 sq ft of wet insulation for removal
  • Crane picks scheduled at 5:30 am shift change on the non-dock side
  • Tapered polyiso rebuilt slopes to 32 drains
  • Daily dry-in sections of 7,000 to 9,000 sq ft
412Ksq ft installed
0dock door closures
26%lower summer roof surface temp (sample)

They built the schedule around our trucks instead of asking us to work around their crane.

Dominic ArceneauxFacility manager, sample client
412Ksq ft installed

More case studies

Other recent work across Greater Houston.

Start a project like this

We have installed tpo membrane on buildings like yours. Let us survey the roof.

Free roof survey · Written proposal in 5 to 7 business days (sample)

Cookie preferences

Choose which cookies you allow. You can change this at any time from the link in the footer.