Roofing for warehouses and distribution
Huge low-slope decks, 24-hour dock schedules and inventory that cannot get wet.

A leak over racked inventory is a claim; a crane in the truck court is a shutdown.
How we plan the work
Distribution centers along the Port of Houston and the Beltway 8 corridor run around the clock. Our replacement plans map crane placement and material staging around dock doors and yard traffic, and we coordinate with your logistics manager on a weekly look-ahead.
For tilt-wall buildings from 100,000 to 600,000 sq ft, we typically recommend 60 mil TPO with tapered insulation to eliminate ponding, reinforced walkway pads to rooftop units and ES-1 edge metal for hurricane exposure.
- sq ft of warehouse roofs installed (sample)
- 4.2M
- dock closures on 2025 projects (sample)
- 0

Our priorities on site
- Crane and staging plans around truck courts
- Daily dry-in over racked inventory
- Tapered insulation to kill ponding
- Hurricane-rated perimeter details
- Portfolio pricing for multi-building parks
Systems we usually recommend
- SYS-01
TPO membrane
Heat-welded white single-ply that reflects Houston sun and keeps big warehouse decks cooler. 20 to 30 years.
TPO details - SYS-05
Metal retrofit
Standing seam panels and recover framing over leaking R-panel or low-slope roofs. 40 to 60 years.
Metal details - SYS-06
Roof coatings
Silicone and acrylic restoration that seals a sound roof and can defer replacement. 10 to 20 years per application.
Coatings details
Warehouses and distribution FAQ
Straight answers on bids, schedules, leaks and warranties. Still stuck? Our estimating desk answers the phone.
Yes. We stage cranes on the non-dock side where possible and schedule picks during shift changes agreed with your yard manager.
We coordinate with your fire protection engineer on insulation and membrane assemblies that maintain FM or UL ratings.
Other industries
- IND-02
Retail centers
Multi-tenant roofs with restaurants, signage and shoppers who should never notice us.
Details - IND-03
Healthcare facilities
Infection control, air intakes and patients below. No shortcuts.
Details - IND-04
Schools and education
Summer-break schedules, public bidding and roofs that take a beating from maintenance crews.
Details - IND-05
Manufacturing plants
Process heat, chemical exhaust and production lines that cannot stop for a roofer.
Details
Plan your roof around operations
We will walk the roof and meet your operations lead in the same visit.
Free roof survey · Written proposal in 5 to 7 business days (sample)